Mibet (Xiamen) New Energy Co,. Ltd

ENAURUESPTJP中文

HomeProductsMRac Ground SolutionMRac Pole Rack System

MRac Pole Rack System

_DSC7551.1.jpg

Brief Introduction

      MRac Pole Rack system is specially designed and manufactured for large commercial and utility scale installations. What is more, the system can be applied to almost all PV ground installation projects in both open and  rough terrain with adjustable tilt angles of 0 to 60 degrees. The unique locking clamps and rails also ensure an easier and quicker installation with simple tools.

Technical Parameter

Installation Site:Ground
FoundationDriven pile, ground screw, concrete bases
Installation Angle10-60°
Wind Load60m/s
Snow Load1.6KN/m2
PV ModulesFramed, unframed
Module OrientationPortrait or landscape
StandardsAS/NZS 1170

DIN 1055

JIS C 8955:2011

International  Building Code IBC 2009

California  Building Code CBC 2010
Profile MaterialsAl6005-T5(Anodized)

Q235B(Hot-Dip Galvanized)
Fasten PartsSteel(Darot)
Small ComponentsAl6005-T5(Anodized)
ColorSilvery or according to customer requirements
Warranty10 years

Advantages

  1. Easy installationHigh qualified railspatented Cross Module technology and pre-assembled supports make the solution time and cost effective.

  2. Versatile ApplicationCan be installed in various kind of soil condition by driven pole or working with Ground Screws.

  3. Good CompatibilitySystem is compatible with most of the major framed PV panels in the market.

  4. Quality GuaranteedOptimized profile geometries designingStrict QC controlled productionSupreme corrosion resistance ability.

Product Structure Diagram

PR.jpg

Components List

1.jpg2.jpg3.jpg4.jpg
End Clamp KitInter Clamp KitC Clamp KitRail 45
5.jpg6.jpg7.jpg8.jpg
Rail 45 SpliceGirderBeam ConnectorBeam
9.jpg10.jpg11.jpg12.jpg
Adjustable Tube ConnectorAdjustive PoleSplice for PostQuadrate Post

Installation Instruction

  1. Install PR-6Quadrate Post. Embed the Quadrate Post into the groove of the flange.

  2. Install Splices for Post

  3. Put the Girder between the two Post Splices, fix it with M14*150 Hexagon Bolts as planned.Then install adjustive Pole.

  4. Connect the Beam with Built-in Fitment by two sets of Hexagonal Bolt M12*90.

  5. Install the Rail

  6. Install Solar Panels

  7. The installation is complete.

Reference Projects

22.jpg

Workshop

Carbon steel factory owns 15 steel rolling production lines, and 4 solar stent aluminum production lines.

1.jpg

Recommended Products

Recommended Projects

Recommended News & Events