Mibet (Xiamen) New Energy Co,. Ltd

ENAURUESPTJP中文

HomeProductsMRac Ground SolutionMRac Ground Terrace IV

MRac Ground Terrace IV

GT4 首.jpg

Brief Introduction

MRac Ground Terrace IV, a newly-updated ground solution on the base of Ground Terrace III, is specially developed for middle-large PV ground projects. With its high structural strength and stability, the highly pre-assembled solution can freely adjust to areas in extreme environments with an all around adjustment, greatly reducing the precision requirements of system installation. What’s more, the structural designs save time and labor cost.

Technical Parameter

Installation SiteOpen terrain – ground mount
FoundationConcrete bases,Ground screws
Installation Angle5-60°
Wind Load80m/s
Snow Load1.6KN/m2
PV ModulesFramed, unframed
Module OrientationPortrait or landscape
StandardsAS/NZS 1170

DIN 1055

JIS C 8955:2011

International Building Code IBC 2009

California Building Code CBC 2010
Profile MaterialsAl6005-T5(Anodized)
Fasten PartsSUS304
Small ComponentsAl6005-T5(Anodized)
ColorSilvery or according to customer requirements
Warranty10 years

Advantages

  1. Fully pre-assembled system saves time and labor cost and make the onsite installation more effective.

  2. The late-model Anchor Plates are more flexible with an all direction adjustable ability especially when used with concrete bases or ground screws.

  3. GT4 tubes & beams are greatly improved in structural strength and stability; the beams can be well installed without drilling or cutting.

  4. T-shaped fastening parts can be used to fix Combiner Boxes or Inverters onto the Tubes without any drilling.

Product Pictures

GT4.jpg

Components List

Wide End Clamp KitU27 Inter Clamp KitC Clamp KitBeam
6.jpg7.jpg8.jpg
Splice for Beam

GT4 Pre-assembled

Support

Corrugated U Anchor

Plate

Corrugated T Anchor

Plate

9.jpg10.jpg

Angle SteelGround Screw

Installation Guide

  1. Installation Ground Screw;

  2. Corrugated U Anchor Plate and corrugated T Anchor Plate will be fixed on the ground screw by using M14 bolt Kit;

  3. The front support of GT4 Pre-assembled should be locked with Corrugated U Anchor Plate; and the back support and side support should be respectively locked with corrugated T Anchor Plate;

  4. Repeat the above steps;

  5. Installation of Rails;

  6. Installation of Back Side Support;

  7. installation of Solar Panels;

  8. complete

Reference Projects

GT4-.jpg

Workshop

Carbon steel factory owns 15 steel rolling production lines, and 4 solar stent aluminum production lines.

2.jpg

Recommended Products

Recommended Projects

Recommended News & Events